{"id":21201,"date":"2023-07-27T05:05:00","date_gmt":"2023-07-27T10:05:00","guid":{"rendered":"https:\/\/latamobility.com\/?p=21201"},"modified":"2023-07-26T15:45:14","modified_gmt":"2023-07-26T20:45:14","slug":"partnership-between-enel-x-way-and-mercado-libre-brings-over-100-charging-points-in-chile","status":"publish","type":"post","link":"https:\/\/latamobility.com\/en\/partnership-between-enel-x-way-and-mercado-libre-brings-over-100-charging-points-in-chile\/","title":{"rendered":"Partnership Between Enel X Way and Mercado Libre Brings Over 100 Charging Points in Chile"},"content":{"rendered":"\n
One of the main players in the massification of charging infrastructure for electric vehicles, Enel X Way<\/strong>, presented, in alliance with MercadoLibre<\/strong>, more than 100 charging points in different regions of Chile<\/strong>.<\/p>\n\n\n\n The supply centers already reach 114 units<\/strong>, located in different MercadoLibre logistics centers throughout the country. <\/p>\n\n\n\n In addition to Santiago<\/strong>, they are located in La Serena, Vi\u00f1a del Mar, Concepci\u00f3n, Chill\u00e1n and Temuco<\/strong>.<\/p>\n\n\n\n These electrolineras operate in a fast and flexible format, and allow the electric fleet in charge of dispatching packages to be charged with energy in the same place from where the route starts. This process can take between 4 and 8 hours depending on the type of load<\/strong>.<\/p>\n\n\n\n In 2022, Mercado Libre and Enel X Way announced the first joint installation of electric chargers<\/strong>, it was 30 charging points located in the distribution centers of the ecommerce company in Renca that allowed to have information on power, usability and charging schedules, to apply logistical efficiency in the operation.<\/p>\n\n\n\nA Year of Joint Work<\/strong><\/h2>\n\n\n\n